sur Kalo Gold Corp. (CVE:KALO)
Kalo Gold Extends Surface Gold Mineralization at Vatu Aurum Project
Kalo Gold Corp has announced an extension of surface gold mineralization at Wainikoro, part of the Vatu Aurum Project in Fiji, now covering 4.3 kilometers. This expansion is based on a sample returning 616 detectORE™ Units, indicating ~0.62 g/t Au, found 1.8 km southwest of previous results. Past assays in the corridor have yielded up to 8.78 g/t Au and 108 g/t Ag.
Exploration activities are ongoing, with field crews carrying out additional prospecting. The company plans to begin drilling at Wainikoro in January 2027. The CEO emphasized the importance of completed IP, CSAMT, and gravity surveys in refining drill targets. A stock option grant to a consultant was also disclosed, involving 500,000 shares at $0.185 each.
R. E.
Copyright © 2026 FinanzWire, tous droits de reproduction et de représentation réservés.
Clause de non responsabilité : bien que puisées aux meilleures sources, les informations et analyses diffusées par FinanzWire sont fournies à titre indicatif et ne constituent en aucune manière une incitation à prendre position sur les marchés financiers.
Cliquez ici pour consulter le communiqué de presse ayant servi de base à la rédaction de cette brève
Voir toutes les actualités de Kalo Gold Corp.